Peninsula Expressway Bridge over Bear Creek Dundalk, MD
- All
- Diving
- Bridges
- Piers & Bulkheads
- Dredging
- Specialty services
- Design Build
- Signing/Lighting/ITS
- Smith Brothers, Inc
- Shugart Manufacturing
- Rehabilitation of twin bascule spans
- Replace the super structure on the approaches
McLean received approval of a Value Engineering Proposal to replace the entire approach structures including the substructure by redesigning the bridge. The owner, at no additional cost, received a new bridge instead of a new super structure on a 50 year old substructure.
Span lengths were shortened, piers were 36” concrete cylinder piles, pre-cast caps and prestressed concrete girders with cast-in-place deck.
Mclean Contracting received a contractor’s performance evaluation rating of “A” for this project.