Widening of the west bound lane approach bridges to the Hampton Roads Bridge Tunnel totaling 9,400 LF. Included demolition of parapet and deck, driving new pile with poured-in-place caps, prestressed concrete beams with cast-in-place deck. (121 of the spans were precast off site, barged to site and erected.) Project also included access dredging.