- Shugart Manufacturing
Project involved the complete removal and replacement of two separate single track timber trestle bridges, immediately adjacent to each other.Each 946 FT bridge was constructed in its entirety, while the other bridge remained active with hourly train traffic. The owner required that train traffic not be stopped in order to install the 144 foundations piles. Therefore, the battered 36” Dia. x 70’ long closed end pipe piles that “fouled” the track clearance envelope had to be installed between trains.
Success Stories
Tradepoint Atlantic: In November 2017, McLean was selected by Tradepoint Atlantic to remove 3 inoperative ore unloading cranes located in Sparrows Point, Maryland.