Gilmerton Bridge Remedial Repairs
- All
- Diving
- Bridges
- Piers & Bulkheads
- Dredging
- Specialty services
- Design Build
- Signing/Lighting/ITS
- Smith Brothers, Inc
- Shugart Manufacturing
Performed structural repairs to both leaves of the bridge’s bascule span during three weekend closures. Replacement structural steel parts were pre-fabricated to plan shape dimensions. Upon removal of the defective members, bolt holes were as-built and we drilled bolt holes in the new parts.
McLean Performed the Following:
● Replacement/repairs to floor beams
● Replacement/repairs to cross bracing
● Replacement of cantilever stringers
● Replacement of center locks
● Replacement of stringers
● Added “sister” stringers
Success Stories
Tradepoint Atlantic: In November 2017, McLean was selected by Tradepoint Atlantic to remove 3 inoperative ore unloading cranes located in Sparrows Point, Maryland.
Read More