This project located at the Rukert Marine Terminal in Baltimore, Maryland. It’s scope of work included the following:
- New vinyl sheetpile wall with steel sheetpile, installed to replace failing existing bulkhead.
- Length of bulkhead was 700 L.F.
- New steel sheetpile was to carry bulkhead loads while the vinyl sheetpile acted as a barrier to prevent corrosion.
- Vinyl sheetpile were “Z” shapes, 30 feet long.