- Constructed 5 new structural deck concrete deck spans with parapet walls in our Chesapeake Yard.
- Closed the bridge to traffic and removed all the existing bridge spans and replaced them with the new in one weekend closure. The project was setup for multiple weekends closures.
- Subcontractor for the electrical work on the spans: E.G. Middleton, Inc.