Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement
This complex $463M design‑build project replaced the Governor Harry Nice Bridge on Route 301, which spanned the Potomac River connecting Maryland and Virginia. McLean was
This complex $463M design‑build project replaced the Governor Harry Nice Bridge on Route 301, which spanned the Potomac River connecting Maryland and Virginia. McLean was
This challenging design‑build project provided design and construction services to replace the existing 88‑year‑old historic swing span bridge over the Perquimans River with a new
Completed in 2019 for the Maryland Transportation Authority, McLean replaced both superstructures on the I-895 bridge over Patapsco River Flats in Baltimore and Anne Arundel
This bridge project was for the construction of a 700-foot long x 46-foot wide bridge structure that spanned the Rudee Inlet in Virginia Beach, Virginia.
The existing MD 331(Dover Road) Bridge was built in 1932 and is a three span, steel Warren truss bridge with a swing-span and concrete deck
This $78.8M project was for the replacement of the existing Lesner Bridges over the Lynnhaven Inlet in Virginia Beach, Virginia with a signature facility capable
This NCDOT Design Build contract was for the replacement of 2 low impact bridges in Pasquotank County and 6 low impact bridges in Perquimans County.
This Maryland State Highway Administration project was for the test pile program for the new Woodrow Wilson Bridge located on the Potomac River and part
McLean Contracting Company was the managing partner for a 4-way joint venture team of local contractors that included E.V. Williams, RR Dawson, and Bryant Contracting
McLean Contracting was the structure team member for an EV Williams lead team on this NCDOT Design Build Project located near Winton, NC. The project